Georgia’s official checkpoint inventory identifies both road and rail customs at Sadakhlo, road access at Ninotsminda in Sameba village, and Guguti and Akhkerpi checkpoints. It separately identifies customs at Poti and Batumi ports. For Armenia this is a network with several land interfaces and maritime exits, rather than a single road. The inventory confirms locations and modes, not continuous availability of every cargo category or a fixed service frequency. A road movement and a rail movement through Sadakhlo use different handling and scheduling processes even where the geographic gateway is shared. [163]
Transit is an administrative product as well as a physical movement. Articles 118–121 of the retained version of Georgia’s Customs Code distinguish transit from release for domestic use and place obligations on the holder and carrier to deliver intact goods and documents within prescribed limits, with guarantees where required. The Revenue Service describes NCTS as an electronic single-declaration and guarantee system for participating jurisdictions. Armenia’s part of a journey still needs its applicable arrangements; Georgian participation alone cannot remove every declaration along an Armenia–Europe chain. [164][162]
The Revenue Service’s 2024 annual report records an electronic service for obtaining NCTS access and mandatory account notifications for goods entering red or yellow customs-processing channels. These are implemented administrative changes with a plausible cost mechanism: earlier usable information can reduce avoidable waiting and repeated document handling, while risk-selected consignments still require the specified controls. For Armenian carriers, infrastructure gains and administrative gains are complementary. A faster road does not eliminate customs processing, and electronic declaration does not create a ferry departure or available wagon. [161][162]
The Armenian government’s list of locations for asylum applications names Bavra, Bagratashen and Gogavan as land crossings with Georgia, and Ayrum as a railway crossing. Its purpose matters: it identifies named physical interfaces, rather than authorising a particular cargo movement. Read alongside Georgia’s inventory, it helps distinguish land and rail locations, but neither list establishes a complete commercial service. Cargo eligibility, vehicle restrictions, opening hours and actual rail departures require separate confirmation from the competent customs bodies and contracted operators. Journey reliability must then be tested on completed shipments. [165][163]
The European Commission’s current customs-transit list confirms Georgia joined common transit on 1 February 2025. The shared procedure supports movements among participating jurisdictions, including the EU and Türkiye, with common transit rules and guarantees. Armenia is not listed as a party; a Georgian transit simplification does not automatically place the Armenian leg inside that system. [167]