"Hayk's Arrow" Armenian Strategic Center

Georgia

Georgia combines a hydro-heavy electricity system with an expanding role in regional transmission.

About this profile

Georgia combines a hydro-heavy electricity system with an expanding role in regional transmission. Its value for Armenia depends on seasonal availability, operational interconnections and workable commercial arrangements, not simply the size of proposed generation. The source library follows the operator’s infrastructure history and separates completed assets, construction, contracts and studies. Plans for the Black Sea and transit to Türkiye are strategically important but do not automatically create Armenian access.

On this page

Sector detail

10

ESCO’s 2025 monthly balance makes hydro categories and trade seasonality visible. Values are GWh; annual imports and exports describe different months and cannot be treated as a continuously available surplus for Armenia.

Sector detail
IndicatorValue and reference period
Total reported generationESCO headline total generation; not customer supply and not installed capacity.13,837.7 GWh2025Reported result[37]
Thermal generationThermal power-station output in the annual balance.2,767.1 GWh2025Reported result[37]
Kartli wind generationReported Kartli wind-plant output; future wind projects are excluded.79.4 GWh2025Reported result[37]
Regulatory hydro generationESCO’s regulatory hydro category; not a guarantee that the entire annual volume can be dispatched in a chosen month.5,238.2 GWh2025Reported result[37]
Seasonal hydro generationESCO’s seasonal hydro category, separate from regulatory and small hydro.4,675.6 GWh2025Reported result[37]
Small-hydro generationESCO’s small-hydro category; rounded hydro subcategories differ by 0.1 GWh from the published hydro total.1,072.9 GWh2025Reported result[37]
Annual electricity exportsAnnual outward flow in ESCO’s balance; electricity transit of 665.3 GWh is separately listed and is not added as Georgian generation or exports.511.2 GWh2025Reported result[37]
Supply to consumersESCO’s supply-to-consumers line; distinct from total consumption of 14,884.1 GWh, which includes other balance items.14,336.3 GWh2025Reported result[37]
Imports concentrated in five cold monthsJanuary–March plus November–December imports: 1,382.483 / annual 1,557.5 GWh. These are five calendar months, not one continuous winter season.88.8% of annual imports2025Reported result[37]
Exports concentrated in May–JuneMay–June exports: 436.220 / annual 511.2 GWh; concentration computed from the displayed monthly and annual figures.85.3% of annual exports2025Reported result[37]

Georgia’s hydro-heavy balance makes the timing of trade as important as its annual volume. Most 2025 imports were concentrated in January–March and November–December, while May and June accounted for most exports. Armenia should test whether its own seasonal deficit coincides with Georgian import demand before treating Georgian hydro as a diversification reserve. The practical requirement is a joint monthly balance with dry-year cases, planned outages, transfer limits and priced delivery periods; a single annual net-trade figure cannot answer that question. [37]

Regulatory, seasonal and small hydro should remain separate in Armenian procurement analysis because they describe different parts of the generating fleet, without by themselves proving firm availability. The 2025 balance also distinguishes Georgian generation, consumer supply and electricity transit. Armenia should preserve those categories in any interconnection business case and verify an actual supplier, dispatch rights and delivery contract. The computed 4.6 GWh gap between the headline generation total and the listed technology totals is an accounting reconciliation residual, not evidence of a solar fleet. [37]

Scope and limitations

National statistical coverage differs from the other countries. Listed thermal 2,767.1 + wind 79.4 + hydro 10,986.6 = 13,833.1 GWh, leaving a computed 4.6 GWh reconciliation residual against 13,837.7. No technology is assigned to it. Monthly sums and rounded annual totals can differ slightly; this is not a forecast of future trade. [37]

Compare Armenia, Azerbaijan and Georgia

What this means for Armenia

Priority and sequence

For Armenia, the first Georgian energy decision is continuity planning across an existing transit relationship, followed by commercial testing of additional flexibility.

For Armenia, the first Georgian energy decision is continuity planning across an existing transit relationship, followed by commercial testing of additional flexibility. The retained gas-security account is a 2024 description, not verification of today's contractual allocation or an interruption. ESCO's 2025 electricity balance separately shows pronounced monthly variation in imports and exports. These sources support testing coincident seasonal pressure; neither proves that a Georgian partner has spare gas or electricity available when Armenia needs it. Operational rights must therefore be confirmed before assigning reliability value. [172][37][173]

Why this comes first

The gas-recovery recommendation ranks first because mapping Armenia's own notification, decision and contractual responsibilities is possible before a foreign partner agrees to a rehearsal. It can expose an actionable domestic gap without purchasing a new asset. The objective is not another protocol for its own sake: it is clarity on who may take each necessary decision, which supplier or operator must assent, and what Armenia must plan to do when that assent or information is unavailable. [172][173]

Proposed sequence

Proposed horizons run from authorisation. Later stages depend on the conditions below; these are analytical choices, not adopted deadlines or funding commitments.

  1. First 90 days

    In the proposed first 90 days, responsible Armenian entities should review current contracts and authorised contacts privately, distinguish domestic decisions from supplier and transit decisions, and list unresolved obligations. Request a joint tabletop exercise only through competent entities. If the request is declined, record the gap in Armenia's seasonal planning rather than describe cross-border recovery as assured. [172][173]

  2. 3–12 months

    Over 3–12 months, close the domestic procedural gaps and test a voluntary demand-flexibility arrangement if the Armenian regulator authorises it. In parallel, price a limited seasonal electricity exchange only against confirmed existing transfer limits, counterpart agreement and settlement obligations. Compare the two responses for the same critical periods, including rebound demand and curtailment rather than annual energy alone. [37][22][27]

  3. Beyond 12 months

    After 12 months, use verified performance and indicative onward-access terms to judge export-dependent generation. Separate the business case from any proposed interconnector or Black Sea capacity that is not yet usable. Keep domestic value in the appraisal: a project that remains worthwhile under delayed export access is less exposed than one whose financing depends on an unconfirmed foreign route. [46][89][16]

Main constraint

The binding constraint is the combination of current contractual authority, usable technical capacity and the cost of maintaining a fallback. Armenia cannot unilaterally allocate a supplier's gas or a Georgian operator's reserve. Staff with access to contracts and qualified system analysis are needed before procurement. Retain sensitive operational detail with the competent entities; public reporting can explain which categories of obligation are verified without revealing vulnerable network arrangements. [172][37]

When another option would be better

If the contractual map and recovery procedures are already complete and tested, repeating the exercise has low value. Prioritise a bounded seasonal electricity pilot when current capacity and delivered economics are confirmed, or domestic flexibility when foreign access remains uncertain. Neither substitutes automatically for fuel continuity. Reorder the response when technical analysis shows which service is actually at risk and which option can protect it at an acceptable total cost. [37][22][172]

Seasonality matters more than annual surplus

Georgia’s 2025 balance concentrated electricity imports in winter and exports in the wetter months. For Armenia, this creates a possible exchange opportunity, but also a risk that both systems seek energy simultaneously. The economic mechanism is the difference between the price and availability of power in a particular hour, plus transmission and balancing costs; an annual hydro share cannot establish it. Armenian plant maintenance and demand patterns could either complement or coincide with Georgian shortages. A useful response is a small, fully costed seasonal transaction using verified existing transfer capability, with settlement and reserve duties agreed before delivery. This is a proposed commercial test, not evidence that additional interconnector capacity is operational. [37][89][114]

Gas transit links two countries’ winter resilience

Georgia’s gas system carries Russian gas toward Armenia while also supplying Georgian consumers and thermal generation. The ministry’s 2024 security statement describes a diversion node that can reduce onward Armenian volumes when used for Georgia’s system. That is a physical interaction, not evidence of a current interruption or an automatic right to curtail Armenian supply. Armenia’s exposure therefore involves both upstream supply and transit operations. Cold weather, maintenance or a pipeline failure could require rapid coordination across different legal and operating entities. A jointly rehearsed notification and recovery procedure would reduce uncertainty about responsibilities without assuming that Georgia can guarantee the original supplier’s performance. [172][173]

Future routes have value only with usable rights

The Black Sea cable preparation and the Azerbaijan–Türkiye transit arrangement illustrate Georgia’s developing role as an electricity gateway. Armenia could benefit only if it secures compatible access through every necessary interface. The retained sources distinguish existing Akhaltsikhe equipment, postponed Armenia–Georgia project deadlines and proposed cable capacity. Those assets and plans cannot be added into a single available Armenian export route. A future project can improve Armenia’s options while simultaneously attracting competing users. The appropriate Armenian response is to obtain indicative capacity, cost and curtailment terms before dedicating new generation or public support to that route, while preserving domestic flexibility that remains useful if the route is delayed. [46][4][59][89][16]

Research

Generation and seasonal dependence

ESCO’s 2025 balance records 13,837.7 GWh of domestic electricity generation, including 10,986.6 GWh of hydropower—about 79.4 percent of the total. Electricity imports were 1,557.5 GWh. These annual figures show the system’s hydro orientation but cannot establish whether electricity was available for export in a particular winter month or hour. [37]

The monthly distribution makes seasonality concrete. In 2025 January and February together accounted for 722.6 GWh of imports, about 46 percent of the annual total. Hydropower in June was 1,327.5 GWh, roughly three times February’s 442.2 GWh. May and June supplied 436.2 GWh of exports, about 85 percent of annual exports. Armenia consequently faces a neighbour whose summer sales and winter purchases differ sharply. The possible complementarity comes from matching that cycle to Armenian plant availability, not from treating Georgia’s annual hydro share as firm year-round export capacity. [37][155][163]

Electricity generation is only part of the energy balance. IRENA’s April 2025 assessment finds domestic production supplying less than one quarter of total primary energy, despite the hydro-dominated power system. Natural gas represents over half of energy imports and oil products about one third. High hydroelectric output therefore does not establish overall energy independence. [175]

Renewables and grid connections

GSE’s April 2026 account describes the Ruisi wind plant as under construction: 33 turbines and 206 MW planned capacity. Four 220 kV bays at the substation were in testing and four connecting lines, totalling nine kilometres, were nearing completion. The announced three-stage grid connection was expected by year-end, not recorded as already complete. [6][26]

The Armenian implication is that new generation and usable cross-border supply are separate propositions. Wind capacity may diversify Georgia’s hydro exposure, yet exportable energy also depends on balancing, curtailment and transmission constraints. Connection progress at substations is thus a better near-term signal than a project’s headline megawatts alone, especially for prospective commercial exchanges. [6][26][58][73][81]

Georgia’s adopted National Energy and Climate Plan sets a 2030 renewable-energy target of 27.4 percent of gross final energy consumption. Its sectoral targets are 85 percent for electricity, 10.45 percent for transport and 7 percent for heating and cooling. These different denominators and future targets must remain separate from measured annual generation shares. [174]

Transmission investment pipeline

In June 2026 GSE announced a GEL65.96 million tender covering double-circuit upgrades of the 220 kV Liakhvi and Urbnisi lines and reconstruction of the Lomisi line. The stated works period was eighteen months after contract signing. Its December 2025 Stori–New Telavi contract concerned a separate 110 kV connection for approximately 47.6 MW. [3][5][9][14][57]

These investments address internal bottlenecks before additional generation can serve domestic or external customers. Armenia benefits only where improved Georgian capacity connects to an accessible bilateral route; a stronger line elsewhere is not equivalent to extra Armenian import capacity. Procurement, commissioning and actual power-transfer limits therefore represent successive, materially different stages of the investment pipeline. [21][35][39][40]

Regional transit and Armenia

The May 2026 agreement between GSE and SOCAR sets key terms for electricity transit from Azerbaijan to Türkiye through Georgia. GSE states that the twenty-year arrangement takes effect on 1 January 2027, with the tariff predetermined for the first three years. Separately, Georgian and Armenian system operators met in November 2025 to discuss cooperation. [4][16][89][114][143]

This strengthens the importance of Georgia’s network as a commercial corridor, while demonstrating that access is negotiated through specific arrangements. Armenia’s interests include transparent capacity allocation, compatible system rules and predictable tariffs. The operator meeting establishes a channel of dialogue, but it is not itself evidence of an Armenian transit entitlement or a concluded supply contract. [89][114][143]

The Black Sea option

The World Bank approved US$35 million in May 2024 for preparatory work on the Black Sea submarine connection. GSE subsequently reported Project of Mutual Interest status and a proposed 1,155 km connection with 1,300 MW capacity in April 2026. Preparation and regulatory recognition improve project readiness; neither establishes a completed cable or available trading capacity. [8][46]

For Armenia, the strategic possibility is access to a wider electricity market through Georgia rather than direct geographical participation in the cable. Realising it would require sufficient upstream interconnection, contractual access and acceptable economics. Different regional “green corridor” proposals also have different configurations; their advertised capacities should not be added together as if one physical project already existed. [15][24][33][34][36]

Flexibility and system governance

GSE’s September 2025 storage consultation identified its Ksani 500 substation as the location for a planned battery connection and linked storage to greater wind and solar integration. The operator’s network plans and market discussions place flexibility alongside new lines. These records describe technical preparation and institutional coordination; they do not provide a measured storage-service output. [22][27][66][77][90]

For Armenia, better Georgian balancing capability could make exchanges more reliable and diversify the services available across the border. Its value will depend on procurement rules, dispatch arrangements and who pays for reserve availability. Tracking system services together with generation avoids overstating the security benefit of a new power plant that cannot reliably deliver at the needed time. [27][29][31][66][72][77][87][90]

The limited voluntary day-ahead and intraday markets launched in 2024 did not complete market reform. The Energy Community’s November 2025 report places balancing and ancillary-service operation by a planned deadline of 1 July 2027, superseding the earlier July 2025 schedule. Its assessment still describes monthly balancing settlement; the future deadline is not evidence of an operational hourly market. [174][43]

The same 2025 assessment records a national energy-poverty target of 15 percent by 2030, against a stated 43 percent baseline in 2017. It also reports no nationwide energy-poverty dataset and no definition in national legislation. The target is consequently not an observed current poverty rate or proof that the intended reduction has occurred. [174]

Gas security and ownership

Georgia’s hydroelectric profile conceals substantial gas dependence. The ministry’s 2024 security statement reports that imports supplied 99.5 percent of gas demand in 2023. Azerbaijan provided 2.457 billion cubic metres through SOCAR and Shah Deniz arrangements, Russia 596.0 million, and domestic production only 15.8 million. This dependence extends into electricity: ESCO records 2,767.1 GWh of thermal generation in 2025, concentrated more heavily in cold months. Imported gas therefore backs up the hydro system exactly when winter electricity demand and low river flows can tighten the balance. [172][37]

The ownership and operating chain separates these risks. State-owned GOGC is the sole founding partner of the company owning the main gas-pipeline system; GGTC holds the transportation licence and operates the network, including Russian transit to Armenia. SOCAR subsidiaries are major suppliers and dominate distribution outside Tbilisi, while Tbilisi Energy serves much of the capital. A commercial dispute with a distributor, a failure in the state transport network and an upstream supply interruption are therefore different events, even when all appear to consumers as a gas shortage. [172]

Gas transit gives Georgia an immediate role in Armenian energy security. GOGC’s annual series reports North-South transit of 2.599 billion cubic metres in 2022, 2.360 billion in 2023, 2.288 billion in 2024 and 2.229 billion in 2025. Over the same period the South Caucasus route expanded to 22.933 billion cubic metres in 2025. These are distinct pipelines and commercial flows. Greater Azerbaijan–Türkiye transit does not itself replace the Russian supply route serving Armenia, but it changes the scale of Georgia’s wider gas-transit business. [173][172]

Armenian access and interconnection history

The Marneuli–Ayrum history illustrates why an identified project is not equivalent to usable capacity. Georgian and Armenian officials discussed a back-to-back station in Ayrum in 2016. A later amendment explicitly postponed construction and commissioning deadlines for the line and converter links, describing two 350 MW units on the Armenian side. A 2025 operator meeting renewed cooperation without reporting that this whole configuration had entered service. The record supports a sustained project relationship and revised deadlines, not a verified 700 MW operating Armenian entitlement. [143][89][114][16]

An operating interface elsewhere has a different evidential status. GSE’s 2023 account described two installed 350 MW HVDC units at Akhaltsikhe, while a third unit remained planned. Such converters enable exchange between systems with different synchronous arrangements, but access still requires capacity and commercial allocation. Armenia’s route to a Turkish or future Black Sea buyer would therefore combine several interfaces: its Georgian connection, internal Georgian transfer capability and the onward border connection. The weakest available interface constrains the whole transaction. [59][72][89][46]

The gas-security statement adds a specific emergency interaction: a node near the Red Bridge can redirect Russian transit gas into Georgia’s domestic system, reducing gas delivered toward Armenia when used. This is a described physical trade-off, not evidence of an actual 2026 interruption. Joint contingency procedures and transparent notification would consequently benefit both countries. For electricity, coordinated maintenance and seasonal exchanges can provide a similar shared benefit; for gas, the priority is preserving reliable transit during simultaneous winter demand stress. [172][114][16]

Risks and opportunities

Risks

Low winter hydropower and imported gas dependence can tighten Georgian supply at the same time that Armenia seeks reliable energy exchange. [37][172]

Repeated changes to interconnection and market-opening schedules can delay Armenian access despite substantial announced megawatts. [89][77][43]

Opportunities

Seasonal electricity exchange and coordinated reserves could complement Georgia’s hydro cycle and Armenian plant availability. [37][114]

Transparent transit and eventual additional interconnection could widen Armenia’s commercial options through Georgia if capacity and contracts are secured. [89][16][46]

Conditional scenarios

These scenarios explore how documented drivers could affect Armenia. They are conditional analytical paths, not predictions or assigned probabilities.

Seasonal cooperation — conditional, not a forecast

If operators secure usable transfer capacity, balancing rules and seasonal contracts, Armenia could import Georgian wet-season electricity and offer supply or reserve services in other periods. The gain depends on complementary availability and prices, not simply installed capacity. [37][114][16]

Joint winter stress — conditional, not a forecast

If low hydropower coincides with constrained gas supply, both countries could face greater competition for available energy and tighter transit management. Prior emergency coordination would matter because the Georgian gas system contains a described diversion interface affecting onward Armenian volumes. [172][37]

What to watch

Priority signals are commissioning of Ruisi connections, award and progress of the Shida Kartli works, the January 2027 transit start, the next financing and implementation decisions for the Black Sea cable, and concrete Georgian–Armenian operating arrangements. Seasonal generation and imports should be checked alongside each infrastructure milestone. [3][4][6][8][10][15]

Source library

175 checked source documents
Coverage and methodology

The count includes distinct documents whose content was retrieved and checked for relevance to this profile. Translations, duplicate links and generic homepages are excluded. A document may support more than one topic when its content is relevant to each. Historical documents retain their original dates; they do not establish that a project or policy remains unchanged today.

Filters

175 / 175 · Original sources

Filters use the source date recorded in this library. Indicator reference periods are shown separately.

  1. International Forum on the Development of the Green Energy Corridor Project Held in Baku
    Georgian State Electrosystem · 26 Oct 2026 · Sources checked: 1 Nov 2026
  2. Georgian State Electrosystem at the CAREC Energy Investment Forum
    Georgian State Electrosystem · 2 Oct 2026 · Sources checked: 1 Nov 2026
  3. Georgian State Electrosystem Launches a GEL 66 Million Energy Infrastructure Project in Shida Kartli
    Georgian State Electrosystem · 10 Jun 2026 · Sources checked: 1 Nov 2026
  4. Agreement Signed Between Georgia and Azerbaijan on Electricity Transit
    Georgian State Electrosystem · 19 May 2026 · Sources checked: 1 Nov 2026
  5. Memorandum Signed Within the Framework of the Urbnisi Substation Construction Project
    Georgian State Electrosystem · 14 May 2026 · Sources checked: 1 Nov 2026
  6. Vano Zardiashvili Visited the Under-Construction Ruisi Wind Power Plant
    Georgian State Electrosystem · 28 Apr 2026 · Sources checked: 1 Nov 2026
  7. Signing Between Georgian State Electrosystem and Metlen Energy and Metals
    Georgian State Electrosystem · 16 Apr 2026 · Sources checked: 1 Nov 2026
  8. European Parliament and European Council Grant PMI Status to the Black Sea Submarine Cable Project
    Georgian State Electrosystem · 14 Apr 2026 · Sources checked: 1 Nov 2026
  9. Meeting on the Urbnisi Substation Construction Project
    Georgian State Electrosystem · 13 Mar 2026 · Sources checked: 1 Nov 2026
  10. Signing within the Framework of the Black Sea Submarine Cable Project
    Georgian State Electrosystem · 26 Feb 2026 · Sources checked: 1 Nov 2026
  11. Meeting with Representatives of the Energy Company Končar
    Georgian State Electrosystem · 13 Feb 2026 · Sources checked: 1 Nov 2026
  12. Bucharest Energy Forum
    Georgian State Electrosystem · 6 Feb 2026 · Sources checked: 1 Nov 2026
  13. Vano Zardiashvili Met with Representatives of METLEN Energy & Metals
    Georgian State Electrosystem · 29 Jan 2026 · Sources checked: 1 Nov 2026
  14. Signing of the Construction Contract for the Stori HPP – New Telavi Transmission Line
    Georgian State Electrosystem · 13 Dec 2025 · Sources checked: 1 Nov 2026
  15. Meeting with the Head of Armenia’s Electric Power System Operator
    Georgian State Electrosystem · 24 Nov 2025 · Sources checked: 1 Nov 2026
  16. Meeting with the Minister of Energy of the Republic of Azerbaijan
    Georgian State Electrosystem · 14 Nov 2025 · Sources checked: 1 Nov 2026
  17. 11th Ministerial on Green Energy Development
    Georgian State Electrosystem · 14 Nov 2025 · Sources checked: 1 Nov 2026
  18. Georgian State Electrosystem at the Georgian Energy Exhibition and Forum
    Georgian State Electrosystem · 12 Nov 2025 · Sources checked: 1 Nov 2026
  19. Agreement between Georgian State Electrosystem and Mitaş Energy
    Georgian State Electrosystem · 4 Nov 2025 · Sources checked: 1 Nov 2026

North–South gas transit

Operator-reported transit toward Armenia.

These are annual transit volumes in the North–South operator series, not total Georgian gas consumption or South Caucasus Pipeline volumes.

North–South gas transit · Billion m³ · 2022–2025
ObservationValue · Billion m³Reference periodStatusSources
20222.5992022Reported result
20232.362023Reported result
20242.2882024Reported result
20252.2292025Reported result

Electricity production: a common 2025 baseline

Sources checked 1 Nov 2026

The comparison uses the same calendar year and separates annual output from capacity, primary energy and trade. Shares are calculated from each source’s reported generation total; national coverage differences remain visible.

On smaller screens, scroll the table sideways to compare all three countries.

Compare Armenia, Azerbaijan and Georgia
Indicator🇦🇲 Armenia🇦🇿 Azerbaijan🇬🇪 Georgia
Reported annual electricity generationGWhRead with stated qualifications10,010.3 GWh2025EstimateSource28,683.0 GWh2025Reported resultSource13,837.7 GWh2025Reported resultSource
Thermal / fuel-based share% of annual generationRead with stated qualifications33.57%2025EstimateSource86.62%2025Reported resultSource20.00%2025Reported resultSource
Hydro share of reported generation% of annual generationRead with stated qualifications21.04%2025EstimateSource9.91%2025Reported resultSource79.40%2025Reported resultSource
Wind share of reported generation% of annual generationRead with stated qualifications0.01%2025EstimateSource0.60%2025Reported resultSource0.57%2025Reported resultSource
Solar share: identified coverage% of annual generation where separately identifiedNot directly comparable16.25%2025EstimateSource2.09%2025Reported resultSourceNot separately identified2025Reported resultSource

Definition and coverage

Reported annual electricity generation

Headline physical electricity production, not primary energy, installed capacity, net customer supply or export capacity. Same year and physical energy unit, but national coverage is not fully harmonized: Armenia includes estimated autonomous onsite use, Azerbaijan separates fuel autoproducers, and Georgia uses ESCO balance categories with a small unresolved residual.

Reading for Armenia

Armenia’s smaller annual total makes outage timing and reserve sharing material; these totals do not establish firm regional supply available to it.

Thermal / fuel-based share

Thermal or fuel-based generation divided by each country’s headline generation. Azerbaijan includes main fuel-fired plants and fuel autoproducers; this is not a harmonized gas-only indicator. Same year and physical energy unit, but national coverage is not fully harmonized: Armenia includes estimated autonomous onsite use, Azerbaijan separates fuel autoproducers, and Georgia uses ESCO balance categories with a small unresolved residual.

Reading for Armenia

Armenia should compare fuel exposure and winter dispatch needs separately from renewable-project MW; no annual share alone measures fuel-supply security.

Hydro share of reported generation

Hydroelectric GWh divided by each country’s reported total electricity-generation GWh, with national coverage qualifications retained. Same year and physical energy unit, but national coverage is not fully harmonized: Armenia includes estimated autonomous onsite use, Azerbaijan separates fuel autoproducers, and Georgia uses ESCO balance categories with a small unresolved residual.

Reading for Armenia

Georgia’s high hydro share makes hydrology and seasonal matching central to an Armenian import case; it does not guarantee a winter surplus.

Wind share of reported generation

Reported wind GWh divided by each country’s headline generation; values are production shares, not installed-capacity shares or forecasts. Same year and physical energy unit, but national coverage is not fully harmonized: Armenia includes estimated autonomous onsite use, Azerbaijan separates fuel autoproducers, and Georgia uses ESCO balance categories with a small unresolved residual.

Reading for Armenia

The low observed shares make actual commissioning and measured output more useful than project announcements when tracking a regional wind transition.

Solar share: identified coverage

Reported solar output divided by headline generation for Armenia and Azerbaijan. ESCO’s displayed 2025 balance does not separately identify solar generation, so no Georgian share is calculated. Partial numeric comparison only. Armenia 1,626.8/10,010.3 and Azerbaijan 600.4/28,683.0; national coverage differs. Georgia is unclassified in this table, not zero; the 4.6 GWh reconciliation residual cannot fill that gap.

Reading for Armenia

Armenia’s reported solar output is already material to annual energy, but an annual share cannot establish evening adequacy. Georgian classification is missing here, so a three-country solar ranking would be misleading.

Scope and limitations

Same year and physical energy unit, but national coverage is not fully harmonized: Armenia includes estimated autonomous onsite use, Azerbaijan separates fuel autoproducers, and Georgia uses ESCO balance categories with a small unresolved residual.

Georgia’s 4.6 GWh computed reconciliation residual is not assigned to solar or another technology. Missing classification is not zero production. Armenian autonomous onsite use is an estimate.

No generation total or share establishes a supplier, contract, open border transfer capacity or firm electricity deliverable to Armenia in a particular hour.

Several countries or indicators can share one underlying data release. Multiple source links do not mean independent confirmation.

Earlier evidence snapshots

2 · Evidence records

These dated records preserve the earlier research edition. Later source releases and statistical revisions are reflected in the detailed analysis above.

Filters

2 / 2 · Evidence records

Documented

2025 electricity balance: hydro leads generation

Reference period: Calendar year 2025; ESCO electricity balance

ESCO reports 13,837.7 GWh of generation in 2025, including 10,986.6 GWh from hydropower. Imports were 1,557.5 GWh. These figures describe electricity, not Georgia's total energy supply or fuel dependence.

Details and sources

Original sources (1)

Announced / planned

Black Sea cable: $35 million for preparation

Reference period: First-phase financing approval in 2024

On 21 May 2024, the World Bank approved $35 million for the first ESPIRE phase, including preparatory work for a potential Georgia–Romania electricity and fibre-optic connection. Financing preparation is not evidence of an operating cable.

Details and sources
Coverage and methodology

This is a curated starting collection, not an exhaustive country database or a live feed. Each record identifies its reference period and links to original evidence. “Announced” does not mean funded, ratified or operational; those distinctions are stated in the text. Armenia implications are editorial analysis, not source quotations. Census counts, population estimates and forecasts must not be treated as interchangeable. Source-check dates do not change the underlying data period.